Typical Residential SOV Structure (G702/G703 Style)
A typical residential SOV organizes the total contract value into major construction phases such as site work, foundation, framing, mechanical systems, and finishes. Many lenders use formats similar to AIA G702 and G703 for tracking draw approvals.
Most residential construction loans use a standardized structure that groups work into logical construction phases. These phases reflect how value is added to the property over time.
The G702 form summarizes the overall draw request, while the G703 continuation sheet lists individual line items and percentage completion. Even when formal AIA documents are not used, many banks follow a similar structure.
Understanding this structure helps owner-builders align their SOV with lender expectations and inspection reports.
Key facts
- SOVs are organized by construction phase
- G702 summarizes draw totals
- G703 details individual line items
- Percent completion drives payment
What lenders look at
Banks rely on standardized SOV formats to maintain consistency across projects. Structured formats reduce confusion and speed draw processing.
Common mistakes
- Creating overly detailed SOV line items
- Combining unrelated phases
- Misaligning phases with inspections
- Ignoring lender-preferred formats
When this typically happens
- During loan setup
- Before first draw submission
- When preparing lender documentation
Frequently asked questions
Do all banks require G702 and G703 forms?
Not all, but many follow a similar structure for draw administration.
Can I create my own SOV format?
Some lenders allow it, but many require specific formatting.
How many line items should an SOV have?
It should reflect major phases without becoming overly granular.
How OwnerDraw helps
OwnerDraw structures SOVs in lender-friendly phase groupings while maintaining alignment with detailed budgets.