Construction Loans & Bank Draws
Construction Loans & Bank Draws
- What Is a Construction Loan? — A construction loan is short-term financing used to pay for building a home. Instead of being paid out at closing like a mortgage, the money is released in stages as work is completed, and during construction you typically make interest-only payments on the amount released so far. When the home is finished, the balance is either converted to a regular mortgage or paid off with a separate loan.
- How Do Construction Loan Draws Work? — A construction loan is not paid out in one lump sum. The money is released in stages called draws. Each time a stage of work is finished, the borrower or builder submits a draw request with supporting paperwork, the work is verified (usually by an inspection), and the funds for that stage are released. The cycle repeats until the home is finished.
- What Is a Bank Draw (and What It Isn't)? — A bank draw is a release of money from a construction loan to pay for work that has been completed. Each draw follows a request, verification of the work, and supporting paperwork. It is not a loan payment, not an advance for future work, and not an automatic or guaranteed deposit.
- Typical Construction Loan Draw Schedule Explained — A construction loan draw schedule is the plan for releasing loan money in stages as work is completed. Most residential schedules use about four to seven draws tied to milestones such as foundation, framing, rough-ins, drywall and insulation, finishes, and final completion. The number of draws and the percentage at each stage vary from project to project.
- What Triggers a Construction Loan Draw? — A construction loan draw is triggered by completing a stage of work and submitting a draw request. The release then depends on the work being verified, usually by an inspection, and on supporting paperwork such as invoices and lien waivers. Time passing is not usually the trigger. Progress is.
- Why Banks Demand a Detailed Construction Budget — Banks demand a detailed construction budget to control risk and ensure loan funds are used appropriately. A line-item budget allows lenders to track spending, verify progress during draws, and confirm that construction costs align with the approved loan amount.
- Why NAHB Cost Codes Matter to Lenders — NAHB cost codes matter to lenders because they provide a standardized way to organize construction budgets and track costs. Using these codes makes it easier for banks to review budgets, verify draw requests, and reduce risk during construction.
- Retainage Explained (5–10% Holdbacks) — Retainage (also called retention or a holdback) is a percentage of each construction payment that is held back until the work is finished. It is usually 5 to 10 percent and is released near the end of the job, after final inspections, any punch-list work, and final lien waivers. It exists to give the payer leverage to make sure the work is completed properly.
- Common Construction Loan Draw Mistakes That Kill Momentum — Construction loan draw mistakes often involve timing, documentation, or budget issues. These mistakes can delay funding, disrupt contractor schedules, and stall overall project momentum.
- What Happens When a Construction Loan Draw Is Delayed — When a construction loan draw is delayed, funds are not released until lender requirements are met. Delays can disrupt contractor payments, slow construction progress, and increase project stress and costs.