What Plans Are Required for Permits?

Most residential permits require a complete plan set that includes architectural drawings, structural details, a site plan, and supporting engineering documents when applicable. Requirements vary by jurisdiction, but incomplete plans are one of the most common causes of permit delays and lender draw issues.

To obtain a residential building permit, the local building department requires a full set of construction documents. These plans must show what will be built, how it will be built, and where it will sit on the property. At minimum, this typically includes floor plans, elevations, foundation details, framing plans, and basic structural information.

In many jurisdictions, especially coastal or high-wind areas, engineered structural drawings are required in addition to architectural plans. This includes sealed foundation designs, framing calculations, and connection details that meet local wind and load requirements.

A site plan is also required. It shows property lines, setbacks, easements, driveway location, and utility connections. Without an approved site plan, the building department cannot confirm zoning compliance.

Lenders often require the same approved plan set that the building department reviewed. Any discrepancy between permitted plans and construction plans can delay inspections and construction loan draws.

Key facts

  • Architectural drawings alone are often not sufficient
  • Structural engineering is commonly required in high-wind or flood zones
  • Site plans must show setbacks and property boundaries
  • Banks rely on the permitted plan set for draw verification

What lenders look at

Lenders want assurance that the approved plans meet code requirements and match the construction budget. If construction differs from the permitted plans, the lender's collateral risk increases.

Common mistakes

  • Submitting incomplete plan sets
  • Assuming stock plans meet local code without engineering
  • Forgetting to include site-specific requirements
  • Making field changes without formal revisions

When this typically happens

  • First-time owner-builders preparing for permit submission
  • Coastal or high-wind zone construction
  • Projects using modified stock plans
  • Additions or structural remodels

Frequently asked questions

Do I need engineered plans for every house?

Not always, but most jurisdictions require structural engineering for foundations, framing, or high-wind zones.

Can I submit hand-drawn plans?

Most building departments require scaled, professional-quality drawings that meet local code standards.

Will the bank review my plans?

Yes. Construction lenders typically review and retain the permitted plan set as part of loan approval.