Tracking Inspection Status
How to schedule and track inspections throughout your build.
Revision staged for the published article at `/help/permits/track-inspections`
(category **Permits & Inspections**, slug `track-inspections`, title and URL unchanged).
Reason: the inspection background in the live body is accurate and is kept, but the title implies
OwnerDraw tracks inspection status. It does not — there is no inspection record, status or result
anywhere in the app, and no reminder. This revision adds a short, honest section on where inspection
information can be kept, without changing the construction guidance.
Apply at release; do not change the slug, title or URL.
---
When inspections happen
Inspections are required at specific points during construction:
- **Foundation** — after footings and before pouring
- **Framing** — after the structure is complete, before closing walls
- **Rough-In** — electrical, plumbing and mechanical, before drywall
- **Insulation** — after installation, before drywall
- **Final** — complete inspection before the certificate of occupancy
Scheduling inspections
Contact your local building department to schedule each inspection. Most departments want 24 to 48
hours' notice. OwnerDraw cannot book an inspection and is not connected to any authority.
What happens if you fail?
1. The inspector notes what must be corrected.
2. Fix the issues.
3. Schedule a re-inspection.
4. Pass the re-inspection before proceeding.
> WARNING: Never proceed with the next phase before passing the required inspection. Work done over
> uninspected work may have to be torn out.
Keeping the record in OwnerDraw
There is no inspection record, status or result field in OwnerDraw, and it never notifies you that an
inspection is due. Keep the trail like this:
| What | Where |
|---|---|
| Expected and actual inspection dates | **Schedule**, as tasks |
| "Call the inspector" and re-inspection chasing | **To-Dos**, with a **Due Date** |
| Inspection reports and correction notices | **Files**, category **Inspections** |
| Your own checks before the inspector arrives | **QC Checklists** — pre-work and post-work, photos optional |
| The permit number | Project settings — **Permit Number** |
A completed QC checklist is your own verification. It is not code compliance, not an inspection
result, and it does not release a payment.
Related
- Permits and inspections: what OwnerDraw actually tracks — `/help/permits/permits-inspections-guide`
- What to Prepare for Inspections — `/help/permits/inspection-prep`
- Common Inspection Types — `/help/permits/common-inspections`