Land, Zoning and Preconstruction
(The stuff people wish they knew before buying dirt)
- Site Prep Costs People Forget — Site preparation costs often extend beyond clearing and grading. Expenses such as erosion control, access roads, fill material, tree removal, temporary utilities, and drainage are frequently overlooked and can significantly increase total project cost.
- Utilities Explained: What's Included vs What's Not — Utilities such as power, water, sewer, and internet may or may not be available at a property. Availability does not guarantee connection, and extension costs are often the buyer's responsibility.
- Wind Zones and Structural Requirements Explained — Wind zones define the wind speeds a structure must withstand. Higher wind zones require stronger connections, enhanced framing, and specific design standards that increase construction cost and complexity.
- Flood Zones, AE, VE, and LiMWA Explained — Flood zones classify land based on flood risk. AE and VE zones require elevated construction and flood insurance, while LiMWA indicates areas subject to wave action. These designations significantly affect design, cost, and financing.
- Zoning, Setbacks, and Easements Explained — Zoning determines how land can be used, setbacks define how close structures can be built to property lines, and easements grant others legal access or use of portions of the property. All three directly affect buildability.
- Soil Tests, Perc Tests, and Why They Matter — Soil tests and perc tests evaluate whether land can support a structure and wastewater system. These tests determine soil strength, drainage, and septic suitability and are critical before purchasing land or starting construction.
- Raw Land vs Improved Lots Explained — Raw land has no utilities or infrastructure in place, while improved lots include some level of site preparation such as utilities, road access, or grading. Raw land typically costs less upfront but carries higher development risk and hidden costs.
- Title Issues That Delay Construction — Title issues such as unclear ownership, unresolved liens, easements, or access rights can delay or stop construction. These problems must be resolved before loans are funded or permits are issued.
- Survey Types Explained for Residential Construction — Different surveys serve different purposes, including boundary verification, elevation, and construction layout. Using the wrong survey can delay permits, cause design errors, or create legal issues.