Loan-to-Cost vs Loan-to-Value Explained
Loan-to-cost (LTC) compares the loan amount to what the project costs. Loan-to-value (LTV) compares the loan amount to what the property is worth, as determined by an appraisal. On a construction loan, lenders typically base the maximum on the lesser of the cost to build or the appraised as-completed value, so whichever ratio is more restrictive sets your loan.
The two ratios
Loan-to-cost is the loan amount divided by the total project cost: LTC = loan amount / total project cost [1][2]. Because it is tied to cost rather than value, it is more sensitive to swings in construction pricing [1].
Loan-to-value is the ratio of the loan amount to the property's value, where the value is determined by a third-party appraisal [3].
Which one applies
For a ground-up build, both matter. Lenders typically base the maximum loan on the lesser of the cost to build or the appraised as-completed value, subject to their loan-to-value limits [4]. One lender guide puts it this way: banks run both ratios and size the loan to whichever produces the lower number [5]. The more conservative ratio wins, which protects the bank and leaves you covering the gap [5].
A worked example
Say the lender's limits are 80 percent LTC and 80 percent LTV (hypothetical numbers):
| Amount | |
|---|---|
| Total project cost (land plus build) | $400,000 |
| Maximum by cost: 80% x $400,000 | $320,000 |
| Appraised as-completed value | $380,000 |
| Maximum by value: 80% x $380,000 | $304,000 |
| Loan the lender would offer (the lower) | $304,000 |
In this example the appraisal, not the cost, sets the loan. You would need to cover the other $96,000 with your own cash or equity. A low appraisal can limit how much a lender will finance even if your construction contract calls for a higher total cost [6]. If the appraisal had come in at $450,000, the cost limit of $320,000 would have been the lower figure.
What counts as equity
Your down payment or equity is the part of the project cost the loan does not cover. Under some programs, land you already own can count toward it [7].
Why this matters for budgeting
Because LTC is based on cost, a cost increase during construction does not automatically increase the loan. Cost overruns often have to be covered with your own funds, so contingency matters. And because LTV depends on the appraisal, a project whose finished value is only slightly above its cost leaves less room for delays or cost increases [8].
Sources
- Kiavi, "LTV vs LTC": https://www.kiavi.com/blog/ltv-vs.-ltc-what-to-know-for-your-investment-property
- Lev, "Loan-to-cost ratio": https://www.lev.co/blog/loan-to-cost-ratio-ltc
- FNRP, "Difference between loan to value and loan to cost": https://fnrpusa.com/?p=6336
- Fortune, "Construction loans": https://fortune.com/article/construction-loans/
- Sound Capital, "LTC vs LTV": https://soundcapital.com/?p=6645
- SmartAsset, "Requirements for a construction loan": https://smartasset.com/mortgage/requirements-for-a-construction-loan
- Experian, "How to get an FHA construction loan": https://www.experian.com/blogs/ask-experian/how-to-get-fha-construction-loan/
- Programming Insider, "Construction finance: what lenders check before funding a project": https://programminginsider.com/construction-finance-what-lenders-check-before-funding-a-project/
Key facts
- Loan-to-cost = loan amount / total project cost.
- Loan-to-value = loan amount / appraised value of the property.
- On a construction loan the maximum is typically set by the lesser of the two.
- A low appraisal can cut the loan below what the cost alone would support.
- The gap between the loan and the total cost is your equity or down payment.
What lenders look at
Whoever is lending wants the borrower to have equity at stake. LTC makes sure you are putting money into the project in proportion to its cost, and LTV makes sure the finished property will be worth enough to cover the loan. Applying both and using the lower number is the conservative approach. The actual percentage limits are set by each lender and loan program.
Common mistakes
- Assuming the loan will be a fixed percentage of the construction contract without checking the appraisal.
- Forgetting to count land, closing costs, and soft costs in total project cost.
- Planning to cover cost overruns from the loan instead of from your own cash.
- Not having cash ready to cover the gap if the appraisal comes in low.
- Mixing the ratios up: LTC is based on cost, LTV is based on appraised value.
When this typically happens
- During loan underwriting, when the budget and appraisal are both in hand.
- When the appraisal comes back and the final loan amount is set.
- If costs change significantly before closing, when the loan may be resized.
Frequently asked questions
Which ratio do lenders use for construction loans?
Both. Lenders typically size the loan to the lesser of the cost to build or the appraised as-completed value [4][5].
What if the appraisal comes in lower than the cost?
The loan can be limited by the appraisal even if your contract is for more, leaving a larger gap for you to cover [6].
Can land I already own count toward my equity?
Under some programs, yes. FHA construction loans, for example, allow land value to count toward the down payment [7].
What LTC or LTV will my lender allow?
That is set by each lender and loan program. The percentages in this article are only examples.
How OwnerDraw helps
OwnerDraw gives you a complete, line-item project cost, which is the number LTC is measured against, so you can see your total cost and your equity gap before you talk to a lender.