Hard Costs vs Soft Costs in Construction Budgets

Hard costs are the direct costs of physically building the house, such as materials, labor, and equipment. Soft costs are everything else needed to get it built, such as design and engineering fees, permits, and financing costs. A complete budget needs both, and soft costs are the ones people most often forget.

Hard costs

Hard costs are direct construction costs: the materials, labor, equipment, and services for the actual building process [1]. Lumber, steel, plumbing, electrical, and masonry are all examples [2], as is foundation construction [3]. Hard costs are typically the largest portion of a construction budget [3].

Soft costs

Soft costs cover professional services, permits, and administrative expenses [4]. Examples include architectural and engineering fees and permits and inspections [4], and financing costs such as interest on construction loans and loan origination fees [3]. Soft costs include things like utility connection fees, which can be easy to underestimate [5].

How the budget typically splits

One published guide says hard costs typically account for 70 to 80 percent of a construction project's total budget, with soft costs making up the remaining 20 to 30 percent [5]. Another cites about 70 percent for hard costs [6]. A common rule of thumb is a 70/30 split, but it is a starting point and not a law, since project type, location, and market conditions shift the balance [7]. Another guide suggests soft costs can run far higher, anywhere from 25 to 75 percent of the construction budget [8], so treat any single ratio with caution.

Here is a hypothetical example using a 75/25 split on a $500,000 total project budget:

CategoryShareAmount
Hard costs75%$375,000
Soft costs25%$125,000

Why it matters

Missing a key soft cost can create cash-flow problems just as easily as underestimating materials [5]. A budget that only lists the visible work, the framing, drywall, and finishes, will be too low. Walk through the whole process from before construction through completion, and list the permits, design, financing, insurance, and fees as well as the physical work.

How it connects to your loan

Lenders review the whole budget, not just the build. How a given lender treats soft costs, including whether they are financed or must be paid in cash, depends on the loan terms, so ask before you finalize your numbers.

Sources

  1. Clockify, "Hard costs vs soft costs": https://clockify.me/learn/business-management/hard-costs-vs-soft-costs/
  2. Buildxact, "Hard costs vs soft costs": https://stg1.buildxact.com/ca/?p=7221
  3. Procore, "Balancing hard costs vs soft costs in construction": https://www.procore.com/library/hard-costs-vs-soft-costs
  4. Boom and Bucket, "Understanding soft costs in construction": https://www.boomandbucket.com/blog/soft-costs
  5. Xero, "Hard vs soft costs in construction": https://www.xero.com/uk/guides/hard-vs-soft-costs-in-construction/
  6. Houzz Pro, "Ultimate guide to residential construction budgeting": https://www.houzz.com/pro-learn/blog/startup-guide-residential-construction-budget-template
  7. MicroEstimates via DEV Community, "Hard cost vs soft cost in project budgeting": https://dev.to/microestimates/hard-cost-vs-soft-cost-in-project-budgeting-11b8
  8. ProjectManager, "Hard costs vs soft costs in construction": https://www.projectmanager.com/?p=60723

Key facts

  • Hard costs are the direct costs of physically building: materials, labor, and equipment.
  • Soft costs are professional services, permits, fees, and financing.
  • A common rule of thumb is roughly 70 to 80 percent hard costs and 20 to 30 percent soft costs.
  • The ratio varies with the project, so it is a starting point, not a rule.
  • Soft costs are the ones people most often leave out of a budget.

What lenders look at

Whoever is lending wants to see a budget that covers everything needed to finish and close out the project, not just the physical building. A budget that lists only hard costs raises questions about where the money for permits, design, and financing is coming from. Treatment of soft costs varies by loan, so ask what can be financed and what has to be paid in cash.

Common mistakes

  • Budgeting only for materials and labor and leaving soft costs out.
  • Forgetting financing costs, such as interest during construction and loan fees.
  • Underestimating utility connection fees, permits, and inspection costs.
  • Using a generic hard/soft ratio instead of listing the actual costs.
  • Mixing the two together so you cannot see what the physical build really costs.

When this typically happens

  • When building the initial budget, before loan approval.
  • As soft costs come due early, such as design, engineering, permits, and loan fees.
  • When reviewing the budget after major milestones.

Frequently asked questions

Are permits hard costs or soft costs?

Permits and inspections are generally treated as soft costs [4].

Is construction loan interest a soft cost?

Yes. Financing costs, including interest on construction loans and loan origination fees, are commonly listed as soft costs [3].

What percentage of my budget will be soft costs?

It varies. A common guide is 20 to 30 percent, but published ranges differ and your own list of costs is a better guide than a ratio [5][7][8].

Does my lender finance soft costs?

It depends on the loan terms. Ask your lender which soft costs can be financed and which must be paid in cash.

How OwnerDraw helps

OwnerDraw's budget keeps hard and soft costs in separate categories, so you can see the full cost of the project, including permits, design, and financing, in one place.

Related articles