What Is Electric Service in a Construction Budget?

Electric service is the permanent connection that brings utility power to the home. It may include service equipment, meter base, utility coordination, connection charges, trenching, conductors, inspections, and related installation work. It is different from temporary electric and different from the house's interior electrical rough-in and final fixture installation.

A completed home needs permanent electrical service from the utility provider. This line item usually covers the work and charges required to establish that final service connection.

Depending on local practice, the cost may include service entrance equipment, meter base, service disconnect components, conduit, service conductors, trenching, boring, utility hookup fees, inspection steps, and coordination between the electrician and the power company.

A common owner-builder mistake is assuming this is automatically included in electrical rough or electrical final. Sometimes it is, but often permanent electric service is treated as a separate budget item because it involves outside utility connection work and utility-company coordination.

It is also important to keep this separate from temporary electric. Temporary electric powers the site during construction. Electric service powers the home permanently.

Key facts

  • Electric service is the permanent utility power connection to the home.
  • It may include service equipment, trenching, connection charges, and utility coordination.
  • It is different from temporary electric.
  • It is different from electrical rough and electrical final.
  • Exact responsibility may be split between electrician and utility provider.

What lenders look at

Banks want to see permanent utilities clearly accounted for because the home is not fully functional without them. A separate electric service line makes it easier to track completion of the project's outside utility connection work.

Common mistakes

  • Confusing electric service with temporary electric.
  • Assuming rough electrical includes permanent utility connection.
  • Forgetting utility company charges.
  • Leaving trenching or boring out of the budget.
  • Not clarifying who supplies service equipment.

When this typically happens

  • After the home is far enough along for permanent service installation.
  • During utility connection phases.
  • Before final occupancy.
  • Sometimes overlapping with late rough or final electrical steps.

Frequently asked questions

Is electric service the same as electrical rough-in?

No. Electrical rough-in is the interior wiring stage. Electric service is the permanent utility power connection to the house.

Does the power company handle all of this?

Not always. Some work is often done by the electrician and some by the utility company.

Should this stay separate from temporary electric?

Usually yes. They serve different purposes and happen at different stages.

How OwnerDraw helps

- Use this line for the permanent power connection, not site-temp power. - Confirm whether trenching, meter base, utility fees, and inspections are included. - Keep it separate from interior wiring if possible. - This line often affects final readiness for occupancy.